A REVIEW, CAFFEINE THERE UP FRONT
THIS DEER GAVE ME A TOUR
SHE’S A JUNIOR. THAT ONE-HUNDRED FIFTEEN MILLION DOLLAR STRUCTURE PLAUSIBLY BUILT BY [REDACTED] CONTRACTOR FOR PENNIES ON THE DOLLAR. FACADE IMPLYING KEKULE ANGLES, PENTA ETHYL AS IT APPEARS, OTHERWISE NOT SO DIFFERENT FROM THE OTHER BIG TEN, IVY LEAGUE, AND LIBERAL ARTS DESIGN TEMPLATE WHICH INDEED CONVERGED AT APPROXIMATELY IDENTICAL, NOT ALWAYS OF COURSE, THE PRINCETON GENOMICS BUILDING COMES TO MIND, PROBABLY THE SAME SIZE AT DOUBLE OR TRIPLE THE COST, JUST A BIT NICER HERE AND THERE, LIKELY USELESS AS SCIENTIFIC VESSEL IN LIEU OF PATHOLOGICAL ONANISM, BOTH AT LEAST NOT GEHRY NIGHTMARES, UNFORTUNATE AS CHEMISTRY HATH BEEN CANCELLED IN MASSACUSETTS SINCE THAT UNSPEAKABLE TRAGEDY, HARVARD NOT EVEN WITH AN HONORABLE MENTION. THE DEER HAS SINCE GONE HOME.
ITS ALRIGHT, NOT SO THE AGE OF SILVER PLASTICS UPON US
OCCLUDED SIGANGE OF NAME AND ADDRESS OF AFOREMENTIONED [REDACTED] CONTRACTOR THAT ALL OF SUDDEN INVOLVED AT LEAST IN THE SCAFFOLDING FOR UP AND UPS IN NEW BRUNSWICK, THE KUSHNER PROPERTIES IN LONG BRANCH AND ASBURY PARK AND INDEED ONE OF THE LOT OF CONTRACTORS INVOLVED IN THE CONSTRUCTION OF THE NEW BUSCH CAMPUS CHEMISTRY FACILITY.
RETURN TO THE NEW BRUNSWICK NEST, NEW STRUCTURES, CONSTRUCTIONS UNDERWAY, AND PROJECTS OUTLAWED
THE TENENTS ATOP THE THIRTY-FOURTH WARD SEEN IN THE FOREGROUND, NEW HIGH RISE UNDER CONSTRUCTION IMMEDIATELY ADJACENT TO NEARLY FINISHED HIGH RISE FOR WHICH MIDDLETOWN AMERICA CONTRACTOR AJD CONSTRUCTION PROVIDED SCAFFOLDING SERVICES.
THE SILVERED STYLE ALL THROUGHOUT, AJD ASSOCIATED PROJECT “RIGGED TO [REDACT]” AS SEEN BELOW,
NO AJD SIGNAGE REMAINS TO BE SEEN IN VICINITY OR OTHERWISE ANYWHERE IN DOWNTOWN NEW BRUNSWICK WITH SOLE EXCEPTION OF THE OBFUSCATED ALBANY TOWER NOTICE SEEN ABOVE, AND THEN THIS NON-SEQUITUR SILVERED THING APART OF STRANGE URBAN CREVASSE ENTERED INTO BELOW,
INQUIRING MINDS WANT TO KNOW
THE TD BANK FINALLY CAPTURED AND SUBDUED BY MIGHTY ORANGE NET, AS BELOW,
NEW CORE UP, HOWEVER NO PUBLIC NOTICE TO MARK PRESENCE OF AJD CONSTRUCTION SCAFFOLDING SERVICE.
THE COMPANY ADVERT OF GILBANE MARKED ON-SITE BANNERS, AS BELOW,
WHAT HAPPENED TO DEVCO? WHY HAS NO PROGRESS BEEN MADE ON THE PURPORTED DOWNTOWN PROJECT SO NAMED THE HUB, STILL AND BORNE BY THE SAME TWO SANDY FIELDS UNDEVELOPED OVER THE COURSE OF ONE YEAR’S TIME, THAT WAS PURPORTED TO HAVE AIMS OF DEVELOPING COMMERCIAL REAL ESTATE FOR “START-UPS”, FRONT COMPANIES, BURROW SHELLS, AND SPACE OTHERWISE MARKED FOR BANNERS PROMULGATING SILICON VALLEY PR SPEAK, AS SEEN BELOW,
THE TWO SANDY FIELDS ADJACENT TO THE BORDER OF THE THIRTY-FOURTH WARD, AS BELOW,
THE NORTH FIELD IS IN ALL LIKELIHOOD ATOP THE FRENCH STREET COPPER MINE, AS SEEN BELOW,
ZOOM IN TO FENCED-IN ENCLOSURE BEARING TWO MANHOLE SIZED OPENINGS THAT ARE PLAUSIBLY THE INTENDED ACCESS POINTS TO BOTH THE SEWERS AND ONE OR MORE TUNNELS OF THE NEW BRUNSWICK COPPER MINES THAT ARE KNOWN TO HAVE BEEN REPURPOSED AS SEWER OUTLETS, AND WHICH ARE INDEED A RATHER WELL KEPT SECRET. FIVE JUNE TWO-THOUSAND NINETEEN PHOTOGRAPH OF THAT ENCLOSURE AS BELOW,
CONTRAST WITH PHOTOGRAPH OF THE VERY SAME ENCLOSURE POSTED HEREUPON ELEVENTH MAY TWO-THOUSAND EIGHTEEN, REPOSTED BELOW,
SITE APPEARS UNTOUCHED THREE-HUNDRED AND NINETY DAYS LATER. CURIOUS REPETITION OF A LENGTH OF TIME MARKED THREE-HUNDRED AND NINETY DAYS FOUND NEAR BOTTOM OF ZONE POST.
[INCOMING TRANSMISSION: WE ARE TOLD DEVCO FORBIDDEN BY LAW TO DEVELOP HUB PROJECT DUE TO PROVEN INENT TO DEVELOP AND USE THE TWO ENCLOSURE POINTS FOR BURROW RELATED ACTIVITIES.]